The dollar lines Colorado procurement law draws.
The figures that run Colorado public purchasing: the Little Miller Act bond lines ($50K local public works, $150K state public works, C.R.S. 38-26-105/106), the 50% performance-and-payment bond rule on state construction over $150K (C.R.S. 24-105-202), prevailing wages on covered state construction contracts awarded for $500K or more (federal funding and CDOT have separate rules) (C.R.S. 24-92-201), and the 10-business-day IFB/RFP protest window (3 business days for small purchases unless extended to 10) (C.R.S. 24-109-102). Every figure links the Colorado Revised Statutes. This page is informational, not legal advice.
C.R.S. §24-103-202
Competitive sealed bidding (Invitation for Bids)
The baseline state procurement method: publicly advertised IFBs awarded to the lowest responsive, responsible bidder. The statute sets the method, not a dollar line; dollar thresholds live in the state procurement rules (1 CCR 101-9) and agency delegations.
For vendors: register in Colorado VSS; IFBs and RFPs for most state agencies and many colleges post there.
olls.info/crs/crs2026-title-24.htmC.R.S. 24-105-202 read on 2026-10-20 in the 2026 Title 24 text linked from the General Assembly CRS download page: over $150,000, performance and payment bonds each 50% of the contract price.
C.R.S. §24-103-203
Competitive sealed proposals (RFP)
When factors other than price matter, the state uses competitive sealed proposals with published evaluation criteria. Award goes to the most advantageous offeror under those criteria.
For professional services: the SOQ/proposal quality decides, not the lowest price.
olls.info/crs/crs2026-title-24.htmC.R.S. 24-105-202 read on 2026-10-20 in the 2026 Title 24 text linked from the General Assembly CRS download page: over $150,000, performance and payment bonds each 50% of the contract price.
C.R.S. §24-105-202
State construction bonds
$150,000
On state construction contracts over this line, the contractor must deliver both bonds (50% of price each) to the state at execution; suits on the bonds follow C.R.S. 38-26-105 to 38-26-107.
For contractors: line up surety capacity before bidding state building work over $150K.
olls.info/crs/crs2026-title-24.htmC.R.S. 24-105-202 read on 2026-10-20 in the 2026 Title 24 text linked from the General Assembly CRS download page: over $150,000, performance and payment bonds each 50% of the contract price.
C.R.S. §38-26-105 / §38-26-106
Little Miller Act: county, city and school district public works bonds
$50,000
Colorado public works bonding: subs and suppliers get a direct right of action against the bond; actions must be brought within six months after completion of the work. Section 38-26-106 requires at least one-half security, with a special annual-maximum basis for contracts of $500 million or more. Check the solicitation for any higher bonding requirement.
For subs: on public work there is no mechanic's lien, the payment bond is your remedy. Track the six-month window.
olls.info/crs/crs2026-title-38.pdf2026 CRS Title 38, §§38-26-105/106 read on the Legislature-linked olls.info host on 2026-10-20.
C.R.S. §24-92-201 et seq. (SB 19-196)
Prevailing wage on state-funded public works
$500,000
The Office of the State Architect states that covered state public-project construction contracts awarded for $500,000 or more require prevailing wages and weekly certified payrolls. Projects utilizing federal funds are exempt from these requirements; CDOT has separate labor-compliance requirements. Purely local projects require a separate local-law check.
For contractors: on state-funded jobs of $500K+, build CDLE wage determinations and certified payroll into your bid.
osa.colorado.gov/state-buildings/prevailing-wage-and-apprenticeshipOfficial Office of the State Architect coverage page read on 2026-10-20; its $500,000 award line and federal/CDOT distinctions are stated here.
C.R.S. §24-109-102(1)
Bid protests: 10 business days for IFBs/RFPs
10business days
Submit a written protest to the procurement official or designee: 10 business days for an IFB/RFP; 3 business days for a small purchase solicitation or award unless extended to 10. The clock starts when the grounds were known or should have been known, which may be before an award notice.
For vendors: track when the grounds become known; do not wait for an award notice to calculate the protest deadline.
leg.colorado.gov/laws/session-laws/HB17-1051/99/downloadOfficial HB 17-1051 section 42 read on 2026-10-20; the current Title 24 file exceeded the fetch size limit and the agency compilation could not be fetched.
Colorado Procurement Code practice
Vendor registration: Colorado VSS
Registration in Colorado VSS (CGI Advantage) is free and required before responding to state solicitations; most state agencies and many institutions of higher education post there. Local governments mostly run their own channels, with many posting on the Rocky Mountain E-Purchasing System (BidNet Direct).
For vendors: one VSS registration covers the state tier; register on BidNet Direct for the local tier.